Homeowners in Utah looking to build or remodel their stairs or stair railing have many questions about the process. This is some of the answers that will help you make an informed decision.
Should I remodel my stairs before or after I install flooring?
The proper order of installation is very important. If you are putting in new carpet or tile the stair railing needs to go in first. With solid hardwood floors is is generally better to put it in before the railing. With LVT and laminate flooring the order in not as important. We can put the railing in before or after but we need to know what flooring you will be using to help you corordnate the process.
When should I plan and design my new stairs or railing?
The sooner in the build or remodel process that you plan out your banister and stair design the better. You need to make sure the framing of the stairs is done in away to accomendate your finished stair idea. On a remodel you will want to plan your railing while you plan your flooring. cabinets or paint. You also have to allow for the time to build your railing and the installation schedule.
Can you match a stain or paint color from our house?
We can match the stain color of your wood railing to your cabinets or wood floor is most cases. With laminate and LVT we can use a stain and wood type that will be very close or compliment your floor. Paint is pretty easy to match.
Do you stain and finish the railing and stairs before or after they are installed?
We like to finish as much as possible before the material is installed. The finish can have a strong smell and can become airborn. We like to finish the wood outside or off site. With all stairs there will be a small amount of touchup after the installation and the process is much cleaner that finishing the stairs after they are installed.
I have a design from a picture can you build it?
We work some of the top manufacturers so we are able to copy most designs that you see. We also have years of experience so we can give you many great design ideas.
What is the best value in a stair railing?
The price of a railing is based on the type of wood and the design of the posts and the type of balusters. The woods that are a better value include Alder, Red Oak, Hickory, Cherry and Maple. White oak and Walnut cost more. Metal balusters can be cheaper the wood balusters and generally are the best long term value. There is is a wide range of prices with both wood and metal balusters so it is best to consult with us.
Can you remove the carpet from under the balusters on my stairs?
Yes we can remodel your stairs so that the sides of the stairs are trimmed with wood and the balusters go int the wood.
Do you remove my old railing?
Yes we will remove the old railing. We leave it in place as long as we can until the new railing is ready to install for your safety.
What is the lead time for the new stairs or railing?
We usually are booked out for a few weeks or more at times. The material can take awhile to make so it is best to contact us well before you need the banister installed.
I just want the balusters replaced on my railing. Is that possible?
In most cases we can replace the balusters with a different style and keep everything else in place>